<pre id="hjjjj"></pre>

      <pre id="hjjjj"><strike id="hjjjj"></strike></pre>
      <output id="hjjjj"></output>
      
      <p id="hjjjj"><del id="hjjjj"></del></p>
        <track id="hjjjj"></track>

        Group Members

        Performance

        EFERENCE

        R
        Performance Current Location: Home > Performance

        Supply Reference:

          


        - Stainless steel pickling line at Plant No.5, Baosteel  (2005) 

        - Desulfurization waste water treatment at power plant, Baosteel (2005)

        - Electric system revamping at plating line of Sumitomo Electric, Suzhou  (2005)

        - Mixed acid regeneration line at Plant No.1, Baosteel (2006)

        - Ammonia flue gas desulfurization at fertilizer plant, Petrochemical, Urumqi  (2007)

        - Glass etching line, phase 1 at Hengtong Optic-Electric, Jiangsu  (2007)

        - U-type tunnel pickling line at Nanjing Baori Wire, Baosteel  (2008)

        - Tunnel pickling line at Xianyang BOMCO Steel Tube & Wire Rope Co.,Ltd (2009)

        - Glass etching line, phase 2 at Hengtong Optic-Electric, Jiangsu (2010)

        - Glass etching line, phase 3 at Hengtong Optic-Electric, Jiangsu (2011)

        - Glass etching line, phase 4 at Hengtong Optic-Electric, Jiangsu (2013)

        - Complete set of glass etching line to STERLITE, Indian and on-site installation guidance  (2014)

        - Stainless steel pickling line of Wuxi Xingcheng WALSIN Steel  (2015)

        - Carbon steel wire pickling line of Xingcheng Special Steel  (2016)

        - Carbon steel wire pickling line of Mascometal  (2017)

         

        Copyright ? 2016 Shanghai History channel than LeBow Engineering Co., Ltd 滬ICP備16020502號 Site Map | Legal Notices
        偷玩熟睡大人裤裆
          <pre id="hjjjj"></pre>

            <pre id="hjjjj"><strike id="hjjjj"></strike></pre>
            <output id="hjjjj"></output>
            
            <p id="hjjjj"><del id="hjjjj"></del></p>
              <track id="hjjjj"></track>